Local: 1 (506) 889-0088Toll-Free: 1-844-543-8123 (LIFT-123)
If you own commercial property, keeping it in good condition is essential. If cracks appear in your foundation, it could mean that there are issues with the ground shifting or water pooling around your building, which could cause more significant problems down the road.
When cracks in the foundation of a commercial building are left unrepaired, they can lead to a whole host of issues—mould growth, water infiltration, structural damage and more. To avoid these problems and ensure the structural integrity of your commercial property is protected, you'll need to have these cracks repaired as soon as possible. The best way to do this is with polyurethane concrete crack injection. It works by filling in cracks in the concrete using polyurethane foam. This process prevents moisture from getting into the foundation of your building and also seals up any cracks so they don't get any more significant over time. Polyurethane concrete crack injection is a durable and long-lasting way to protect your investment in your commercial property.
Polyurethane crack injection is a two-step process. First, we will inspect the foundation and locate any cracks that need to be repaired. The second step is the actual crack injection. To do this, we drill angled holes in the wall beside the crack and injection ports are installed. We then inject polyurethane foam into the crack, where it expands, fills the cracks and seals them. Our fast, efficient process can be completed in as little as one day, making it perfect for commercial properties. Polyurethane concrete crack injection is the most common solution for damp, cracked foundations. The cost and length of time needed to complete the process will depend on the size and location of the cracks, but it is far less expensive than replacing the foundation of your commercial building. If your commercial property has cracks in the foundation and you need them repaired, contact Maritime Concrete Lifting today!
Using polyurethane foam for concrete crack injection is the ideal way to repair cracks in the foundations of commercial buildings. It offers many benefits over other repair methods. It's strong, resistant to water and the elements, and lasts for years.
The main benefit of using polyurethane foam for concrete crack injection is its longevity. In most cases, polyurethane foam will last forever when used as a sealant in concrete foundation walls. This means you won't have to worry about the foam deteriorating or the cracks worsening over time.
Polyurethane foam is also resistant to water and elements, making it perfect for damp or wet foundation walls. Polyurethane foam concrete crack injections can also be applied to damp surfaces. This means contractors do not need to wait for the surface around the crack to dry to begin. Another excellent advantage of polyurethane concrete injection is its flexibility. It allows for slight movement or shifting of the foundation, protects your commercial property and prevents further damage.
Polyurethane foam is also easy to install! It can be applied directly over existing cracks or holes, so there's no need for any extra preparation work before beginning installation. It also has a fast cure time, so it will begin to work immediately. Polyurethane foam is also environmentally friendly. It is made of partly recycled materials and contains no toxic chemicals that can harm people using your commercial property. If you are looking for the most innovative, durable and long-lasting way to fix cracks in the foundation of your commercial property, the team at Maritime Concrete Lifting can perform polyurethane concrete crack injection quickly and efficiently.